The fourth taq (arch) is set in place. The height of the arched openings (taqis) is 2ms. |
|
The roof slab with an opening of the pyramid dome is set in place. |
|
|
The form for the pyramid dome is added. |
|
The Sun showers its blessings. |
|
|
The stones for the pyramid dome are set in place. |
|
The outlet for the methane gas and soon to be Atashdan is formed. The construction method & material are similar to that used when mking a tandoor. |
|
The fire ablaze in its new home. |
|
The construction crew of four with their supervisor, Hasan Aghayev, director of the Khinalig Village Museum and a Khinalig school teacher, and the blazing fire, in the centre. All are residents of Khinalig village. |
|
The Khinalig Atashgah in all its splendour. Congratulations to Farroukh Jorat and his entire team on their wonderful work and legacy. |